Participation in projects
- Design and construction of a Workshop for inactivated vaccines for industrial poultry farming in accordance with GMP
- Reconstruction of the Moscow Ring Road
- Highways M-5 "Ural", M-10 "Russia", M-1 "Belarus", M-7 "Volga", toll road to Sheremetyevo
- Objects of the Third Transport Ring (Kutuzovskaya interchange, Gagarin highway tunnel, Donbass overpass, Luzhniki underpass)
- Lefortovsky tunnel
- Moscow Metro facilities (construction of open- and closed-type distillation tunnels with tunnel structures)


- Reconstruction of the section of the Kievskoe highway from Moscow Ring Road to Vnukovo-2
- Reconstruction of Borovskoe highway
- Inner-city ring highway from Moscow International Business Center, Moscow-city to Leningradskoe highway, transport interchange at the intersection of the 3rd small and 3rd large transport rings with Krasnopresnensky avenue
- Reconstruction of the M-8 highway “Kholmogory”
- Reconstruction of the airport runway, taxiways, aircraft parking areas in the Domodedovo airport
- Construction of the building of the main emergency rescue station
- 3rd transport ring from Volgogradskoe avenue to the Entuziastov highway. Nizhegorodskaya overhead road and clearance box
- Construction of a new International passenger terminal at Vnukovo airport
- Installation of reinforced concrete bored piles, installation of an anchor system for support of excavation during the construction of residence buildings at the address: Moscow, Rublevskoe highway, building 107
- Installation of “soil mix wall” of the mine shaft fence at the address: Moscow, 1st Frunzenskaya str., 24
- Shaft for re-laying pressure pipelines for the Savvinskaya pumping station at the address: Moscow, Pushkinskaya embankment (Gorky park)
- Installation of “soil mix wall” at the construction site "Multifunctional complex" at the address: Moscow, Lesnaya str., build. 27


- Arrangement of guide wall, production of reinforcement cages, installation of a monolithic railway binding beam, installation of an anchor system at the facilities constructed by JSC Soletanshstroy
- Installation of “soil mix wall” at the construction site: "Diverting pipelines from the Central Sewerage Pumping Station to the South-Western channels of Moscow", mine shaft №2, chambers number №№ 5, 6
- Construction of the Emergency rescue station building at the construction site "Reconstruction of Domodedovo airport»
- Installation of “soil mix wall” at the construction site: "Diverting pipelines from the Central Sewerage Pumping Station to the South-Western channels of Moscow", mine shaft № 2, chamber № 5
- Production and installation of structures for excavation shoring during the "Construction of capital construction objects of the residential area "Sadovye kvartaly" Khamovniki district, Moscow
- Construction of a pumping station and laying of engineering networks for the construction of the inner-city ring highway (3rd ring) from Volgogradskoe avenue to Entuziastov highway
- Building of the Emergency rescue station at the construction site "Reconstruction of Domodedovo airport"
- Construction of running tunnels by open method of works on the section from the metro station Starokachalovskaya street to the station Bitsevsky Park
- Construction of a pedestrian crossing at PK79+20 Podushkinskaya interchange
- Installation of transformer substation foundations during the construction of the Moscow – Saint Petersburg highway
- Construction of the lobby and underground part on the construction site from the station Maryina Roscha to the metro station Petrovsko-Razumovskaya
- Construction of running tunnels and the metro lobby by open method of works on the section from the metro station Rechnoy vokzal to Khovrino
- Construction of a heating network on the construction site: "Section of the Moscow-Saint Petersburg highway (Severnaya rokada). The area from Festivalnaya street to Dmitrovskoe highway


- Construction and finishing of the Belomorskaya station complex
- Construction and finishing of underground pedestrian crossings of Khovrino station
- Construction of supporting walls, concreting of pillars and cones, construction of technological platforms at the transport interchange 27 km of the M-1 highway "Belarus" from Moscow through Smolensk to the border with the Republic of Belarus
- Installation of concrete preparation and foundation slabs MGF-25 during the construction and reconstruction of the M-5 "Ural" highway from Moscow via Ryazan-Penza, Samara to Chelyabinsk on the section 19-28+00 Moscow region
- Waterproofing on the bridge floor of the overpass № 3 on the construction of a Transport interchange at 27 km of the M-1 "Belarus" highway from Moscow through Smolensk to the border with the Republic of Belarus
Participation in projects
Design and construction of a Workshop for inactivated vaccines for industrial poultry farming in accordance with GMP
![]()
Reconstruction of the Moscow Ring Road
![]()
Highways M-5 "Ural", M-10 "Russia", M-1 "Belarus", M-7 "Volga", toll road to Sheremetyevo
![]()
Objects of the Third Transport Ring (Kutuzovskaya interchange, Gagarin highway tunnel, Donbass overpass, Luzhniki underpass)
![]()
Lefortovsky tunnel
![]()
Moscow Metro facilities (construction of open- and closed-type distillation tunnels with tunnel structures)


Reconstruction of the section of the Kievskoe highway from Moscow Ring Road to Vnukovo-2
![]()
Reconstruction of Borovskoe highway
![]()
Inner-city ring highway from Moscow International Business Center, Moscow-city to Leningradskoe highway, transport interchange at the intersection of the 3rd small and 3rd large transport rings with Krasnopresnensky avenue
![]()
Reconstruction of the M-8 highway “Kholmogory”
![]()
Reconstruction of the airport runway, taxiways, aircraft parking areas in the Domodedovo airport
![]()
Construction of the building of the main emergency rescue station


3rd transport ring from Volgogradskoe avenue to the Entuziastov highway. Nizhegorodskaya overhead road and clearance box
![]()
Construction of a new International passenger terminal at Vnukovo airport
![]()
Installation of reinforced concrete bored piles, installation of an anchor system for support of excavation during the construction of residence buildings at the address: Moscow, Rublevskoe highway, building 107
![]()
Installation of “soil mix wall” of the mine shaft fence at the address: Moscow, 1st Frunzenskaya str., 24
![]()
Shaft for re-laying pressure pipelines for the Savvinskaya pumping station at the address: Moscow, Pushkinskaya embankment (Gorky park)
![]()
Installation of “soil mix wall” at the construction site "Multifunctional complex" at the address: Moscow, Lesnaya str., build. 27


Arrangement of guide wall, production of reinforcement cages, installation of a monolithic railway binding beam, installation of an anchor system at the facilities constructed by JSC Soletanshstroy
![]()
Installation of “soil mix wall” at the construction site: "Diverting pipelines from the Central Sewerage Pumping Station to the South-Western channels of Moscow", mine shaft №2, chambers number №№ 5, 6
![]()
Construction of the Emergency rescue station building at the construction site "Reconstruction of Domodedovo airport»
![]()
Installation of “soil mix wall” at the construction site: "Diverting pipelines from the Central Sewerage Pumping Station to the South-Western channels of Moscow", mine shaft № 2, chamber № 5
![]()
Production and installation of structures for excavation shoring during the "Construction of capital construction objects of the residential area "Sadovye kvartaly" Khamovniki district, Moscow
![]()
Construction of a pumping station and laying of engineering networks for the construction of the inner-city ring highway (3rd ring) from Volgogradskoe avenue to Entuziastov highway


Building of the Emergency rescue station at the construction site "Reconstruction of Domodedovo airport"
![]()
Construction of running tunnels by open method of works on the section from the metro station Starokachalovskaya street to the station Bitsevsky Park
![]()
Construction of a pedestrian crossing at PK79+20 Podushkinskaya interchange
![]()
Installation of transformer substation foundations during the construction of the Moscow – Saint Petersburg highway
![]()
Construction of the lobby and underground part on the construction site from the station Maryina Roscha to the metro station Petrovsko-Razumovskaya
![]()
Construction of running tunnels and the metro lobby by open method of works on the section from the metro station Rechnoy vokzal to Khovrino
![]()
Construction of a heating network on the construction site: "Section of the Moscow-Saint Petersburg highway (Severnaya rokada). The area from Festivalnaya street to Dmitrovskoe highway


Construction and finishing of the Belomorskaya station complex
![]()
Construction and finishing of underground pedestrian crossings of Khovrino station
![]()
Construction of supporting walls, concreting of pillars and cones, construction of technological platforms at the transport interchange 27 km of the M-1 highway "Belarus" from Moscow through Smolensk to the border with the Republic of Belarus
![]()
Installation of concrete preparation and foundation slabs MGF-25 during the construction and reconstruction of the M-5 "Ural" highway from Moscow via Ryazan-Penza, Samara to Chelyabinsk on the section 19-28+00 Moscow region
![]()
Waterproofing on the bridge floor of the overpass № 3 on the construction of a Transport interchange at 27 km of the M-1 "Belarus" highway from Moscow through Smolensk to the border with the Republic of Belarus